Air-conditioner Installation Project 02

- Apr 28, 2020-

① The installation position of the support and hanger at the turning point of the air pipe is correct.

②The air duct hanging code is at a 90-degree angle with the air duct, and the appearance is better, but there is no groove-shaped galvanized plate with a width of 100mm installed at the rear to increase the pressure-bearing area of the insulation material.

③The insulation of the flange joint of the air pipe is neat and beautiful.

④ The interface cut at the side seam of the wind pipe is neat and beautiful, without bulging.

vent duct